Subaru Advisor Commmittee approved our 300 nights proposal over 5 years.

Collaborators

We now have more than 200 CoI.

Fields



We will also plan to obtain broad-band images in grizy 5 band on the All-wavelength Extended Groth Strip (AEGIS) field (RA = 14h17m,Dec = +52◦30' to calibrate photometric redshift. It would be single poiting and 1 hour exposure on each band.

Depth

Expected limiting magnitude is shown above.

Public Data Release

The public data release of roughly 1/5 of the total amount is scheduled in early 2017. The release package includes raw images, catalogs of objects as well as reduced (stacked) images. The following public data release is planned every two years after the first release.